Catamaran for fish farming purpose during sea trials and testing. We can see in picture-in-picture the same boat during construction in MERCURIO PLASTICS boat yards.
Small well boat during stability testing,
Docked feed barge before departure for the fish farm.
Feed barge towed from Scotland to south of Spain.
Barge used to drop 10 tons concrete blocks for offshore fish farming facility.
Part of oxygenation system plan for the tank of a live fish carrier (well boat).
Chronogram for a project of fish cages
Project fiche collating and summarizing technical, economical and productive data.

CULMAREX GROUP- 2007

Águilas - Spain.

 

Responsible for the installation of 7 cages and their mooring system.

  • 4 cages of 25 m diameter. Almeria.
  • 3 cages of 28 m diameter. Guardamar.

Over 20 years’ experience and know how in aquaculture to ensure the success of your projects.

Contact us